首页> 外文会议>International Conference of Computational Methods in Sciences and Engineering >New Inland Waterways in Heavily Invested Areas - Conditions and Hazards
【24h】

New Inland Waterways in Heavily Invested Areas - Conditions and Hazards

机译:新的内陆水道在重大投入领域 - 条件和危害

获取原文

摘要

The planned Silesian Canal is an artificial water conduit connecting the main Polish rivers - the Oder and the Vistula - in the south of Poland. The analysis of conditions and hazards resulting from the creation of a new water conduit in a heavily invested area has been performed. Scarce local water resources and the need to feed the canal with a system of pumps supplying water from the Vistula and the Oder as well as other additional systems were pointed out. Attention has been paid to the course of the canal route through mining areas and through areas with documented hard coal resources. Collisions with environmentally valuable areas that are protected by law were also considered. It was found that due to the complicated conditions and numerous risks at the planning stage, it is necessary to select an optimal direction of the canal route that will have the least negative impact on the environment.
机译:计划的Silesian运河是一种连接主波兰河流的人造水管道 - 在波兰南部的臭臭和维吾尔。 已经进行了在大量投资区域中创建新的水道导致的条件和危害的分析。 稀缺当地的水资源和使用从维斯拉和味道供应水的泵和其他额外系统的泵和其他系统需要喂养运河的需要。 通过采矿区和通过记录的硬煤资源的地区支付了对运河路线的关注。 还考虑了与法律保护的环境有价值区域的碰撞。 发现由于规划阶段的复杂条件和众多风险,有必要选择将对环境产生负面影响的运河路线的最佳方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号