Strategy to incorporate BIM curriculum in Planning and Scheduling classes

机译:将BIM课程纳入规划和调度课程的策略

获取原文

摘要

Architect-Engineer-Construction (AEC) employers have begun expecting that construction program graduates have a working knowledge of Building Information Modeling (BIM). This paper is an attempt to adopt this new skill-set in educational institutions along with the fundamental techniques of Planning and Scheduling already being taught. To incorporate the BIM curriculum pertaining to the class topics, it was determined essential to introduce students to project scheduling and simulation software. Though a wide variety of tools are now available and used in the industry, P6 scheduling software and Synchro simulation tools were opted based on user conform level, easy access and availability for education institutions. A 3D model scenario along with a schedule from a project was used to create a simpler scenario for academic purpose. The project was introduced to the students and the task of creating a meaningful schedule in P6 was assigned. The students were provided with specific assignments and tutorials to help them navigate through P6 and aide in creating their schedules during the lab sessions. To continue the implementation, students have guest speakers from industry who discussed and showed them the real time implementation of schedules and how they should manage schedule changes, updates and other important considerations to address. The strategy to incorporate BIM curriculum into this important topic for Project Managers is finalized with a 3D Synchro model and students are asked to go through a tutorial that would make them to better understand the link of a previously generated P6 schedule to the model and to develop a 4D simulation.
机译:建筑师工程师建设(AEC)雇主已经开始期待建筑计划毕业生有建设信息建模(BIM)的工作知识。本文试图在教育机构中采用这种新技能,以及已经教授的规划和调度的基本技巧。为了纳入与课堂主题有关的BIM课程,它决定将学生引入项目调度和仿真软件。虽然现在可以使用各种工具并用于行业,但P6调度软件和同步仿真工具是根据用户符合级别的选择,方便访问和教育机构的可用性。 3D模型方案以及来自项目的时间表用于创建一个更简单的学术目的方案。该项目被引入学生,并指定了在P6中创建有意义的计划的任务。学生们被提供有特定的作业和教程,以帮助他们在实验室会话期间创建他们的时间表的P6和助手。为了继续实施,学生有来自讨论的行业的访客讲话,并展示了他们的实时实施时间表以及他们应该如何管理计划变更,更新和其他重要考虑因素。将BIM课程合并到项目经理中的这一重要主题的策略最终以3D同步模型完成,并要求学生通过教程,使其能够更好地了解先前生成的P6计划的链接到模型并开发4D模拟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号