Nile Delta Production Challenges-Temporary Production Facility Solutions

机译:尼罗三角洲生产挑战 - 临时生产设施解决方案

获取原文

摘要

This paper presents the process of an accelerated commissioning of a gas field in the Egyptian Nile Delta in 2013.The Disouq Development Project and Production and Reservoir Teams of RWE Dea(Nile Delta) AG together with DISOUCO(the JV Operator)implemented a Temporary Production Facility(TPF)at North West Khilala Field(Onshore Nile Delta,Egypt)to achieve timely first gas production of 50 MMSCFD during 2013.The careful evaluation of this project can serve as a guide to others who are involved in the planning and preparation of onshore facility installations in challenging geopolitical settings. The installation success on North West Khilala Field was accomplished by carefully focusing on several key areas:an appropriate fit-for-purpose organisation among participating companies,a clearly defined technical scope,and a rational philosophy and effective relationships with regulatory organisa- tions.Active involvement of a fully integrated team of production geoscientists together with drilling, completion,reservoir,facility and commissioning engineers was critical in achieving success. Based on an economic business case RWE Dea AG mutually decided with JV Shareholder Partner EGAS to deviate from the original Plan of Development(PoD)submitted in 2010 and start the construction of temporary production facility at North West Khilala field in parallel to the execution of the approved development project.The work included the perforation,completion and testing of already drilled North West Khilala wells(1 discovery and 2 appraisal wells),finalisation of flowline/trunkline installations from the wells to the temporary production facility and tie-in of the TPF to the national grid export lines. By executing the temporary production facility plan,RWE Dea AG has been able to make a seamless transition from facility design and construction to facility production and export of first gas and
机译:本文介绍了2013年埃及尼罗河三角洲的气田加速调试的过程。争夺RWE DEA(尼罗河三角洲)AG的差别开发项目和水库团队与Disouco(JV运营商)实施了临时生产在西北Khilala田野(埃及伊斯尔达州)的设施(TPF)在2013年期间实现了50 MMSCFD的及时的第一个天然气产量。该项目的仔细评估可以作为参与规划和准备的其他人的指南陆上设施在扎根地缘政治环境中的设施。以西北西北田野的安装成功是通过仔细关注几个关键领域:参与公司之间的适当适合型号,明确定义的技术范围,以及与监管组织的理性哲学和有效关系。活化与钻井,完工,水库,设施和调试工程师一起参与完全综合的生产地球科学家与钻井,完工,水库,设施和调试工程师在实现成功方面至关重要。基于经济业务案例,RWE DEA AG与JV股东合作伙伴EGA相互决定,偏离2010年提交的原始开发计划(POD),并开始在西北Khilala领域的临时生产设施与执行的执行批准的发展项目。该工作包括对已经钻井西·西尔拉尔井(1个发现和2家评估井)的穿孔,完成和测试,从井到临时生产设施和TPF绑定的流线/干线安装到国家电网出口线。通过执行临时生产设施计划,RWE DEA AG能够从设施设计和施工到设施生产和出口的第一天然气的无缝过渡

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号