首页> 外文会议>International Petroleum Technology Conference >Ceramic Screens-An Innovative Downhole Sand Control Solution for Old and Challenging Cased Hole Completions
【24h】

Ceramic Screens-An Innovative Downhole Sand Control Solution for Old and Challenging Cased Hole Completions

机译:陶瓷屏幕 - 用于旧的落壳孔完成的创新井下砂控制解决方案

获取原文

摘要

Erosion in gas wells caused by sand producing formations can result in severe operational issues leading to the degradation of surface and downhole equipment and the shutdown of production facilities at surface. Old cased hole wells in highly unconsolidated, poorly sorted sandstone formations require robust sand control. In such instances, conventional gravel packing methods are not always possible and the installation and maintenance of downhole sand control throughout the well life can be challenging. In gas wells where sand velocities are high, the supporting metallic material being used in, for example standalone sand control screens is subject to plugging and subsequent rapid wear because of its low resistance to erosion. Hence the longevity of metallic sand control equipment is poor and frequent expensive re- completions and workovers are required. An innovative solution using ceramic screens was used in an existing gas well in Bolivia, South America. The well geometry included double casing with sub-optimal cement across the target zone and, due to the complexity of voids behind the casing, it was not possible to perform the initial option of a cased-hole gravel pack. In addition to sand control the completion required mechanical zonal isolation to prevent water ingress at a later stage. In summary the project involved removing the existing completion, isolating deeper lying depleted producing zones, clearing the casing of debris, re- perforating the casing, installing a new completion with ceramic screens and zonal isolation valves. BG Group in conjunction with German ceramics manufacturer ESK developed over a period of 18 months a series of ceramic sand control screens and sliding sleeve protections that provided a downhole sand control completion solution complete with mechanical water isolation. The successful project exceeded all expectations and to date the well has produced sand free. The operational time and re- completion costs were less than of a cased-hole gravel pack, the operation much simpler and safer. BG are now working on a project to use this innovative technology as a thru-tubing sand control solution for existing high rate gas wells offshore worldwide where open hole or cased hole gravel packs have failed.
机译:由沙子生产形成引起的气井侵蚀可能导致严重的运营问题,导致表面和井下设备的降解以及表面的生产设施关闭。老外壳孔井在高度未溶胀的砂岩地层中,需要坚固的砂岩。在这种情况下,传统的砾石填料方法并不总是可能的,并且在整个井寿命期间的井下砂控制的安装和维护可能是具有挑战性的。在砂速度高的气井中,所使用的支撑金属材料例如独立的砂对照屏幕受到堵塞和随后的快速磨损,因为其对腐蚀的低抗性。因此,金属砂控制设备的寿命差,频繁的昂贵的完成和讨论。使用陶瓷屏幕的创新解决方案用于南美洲玻利维亚的现有气体井。井几何形状包括双套管,其跨靶区域具有次优的水泥,并且由于壳体后面的空隙的复杂性,因此不可能执行套筒砾石包的初始选择。除了砂控制外,完成需要机械区域隔离,以防止后期进水。总之,该项目涉及删除现有的完成,隔离更深的躺着的生产区域,清除碎屑的外壳,重新穿孔,用陶瓷屏幕和陶瓷隔离阀进行新的完成。 BG组与德国陶瓷制造商ESK一起开发,在18个月内开发了一系列陶瓷砂控制屏和滑动套筒保护,提供了井下砂控制完成解决方案,采用机械水隔离。成功的项目超出了所有期望,并迄今为止井产生了自由。操作时间和再完成成本低于套管砾石包,操作更简单,更安全。 BG目前正在研究一个项目,将这种创新技术用作全球现有高速燃气井的全球性高速储气井的陆管砂防护解决方案,其中开孔或套管砾石包失效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号