首页>
外国专利>
Method and aprelhagem sand control of more pipeline do connection, including a completion of well production tubing.Method of installation of a complete sand control and tube assembly for use in a washing sand control completion
Method and aprelhagem sand control of more pipeline do connection, including a completion of well production tubing.Method of installation of a complete sand control and tube assembly for use in a washing sand control completion
Method and apparatus for sand control pipe connection, the completion of the well including a production tubing.Method of installation of a complete sand control and tube assembly for use in a finishing washing sand control ".In one aspect, the invention can understand a completion of well including a production tubing.A trim upper connected with a lower end of the production tubing (14), a smart card (24) disposed below the upper gasket (18).A control cable continuous (30) running from the smart card (24) from a connection point.And a sieve sand (21) disposed below the intelligent device (24) from a connection point, and a sieve sand (21) disposed below the Garrison (18).The completion can be installed in a pit in a strip simple instead of multiple.The sand control operations can be carried out by a work tool (50) is used through the production tubing (14).The completion may include the ability of underground well washing once completion is ongoing at the site. Related methods are also provided.
展开▼