Revisiting Whittier Tunnel 20 Years After Conversion to Dual Rail/Highway Service

机译:转换为双轨/公路服务后20年重新审视Whittier Tunnel

获取原文

摘要

In 2001, the 13,300-foot-long Anton Anderson Memorial Tunnel (AAMT) opened for dual highway and rail traffic. The conversion from rail earned the longest roadway tunnel in North America an American Society of Civil Engineers (ASCE) Outstanding Projects and Leaders (OPAL) Outstanding Civil Achievement Award for engineering excellence. The AAMT has transformed the economy of Whittier, a coastal community 60 miles southeast of Anchorage, Alaska. As the tunnel approaches the successful end of its original 20-year design life, the Alaska Department of Transportation & Public Facilities (Alaska DOT&PF) and the Alaska Railroad Corporation (ARRC) seek to extend the service life of the tunnel. This paper describes investigations, designs and construction enhancements to ground support and drainage systems, portal structures damaged by avalanches, emergency generator capacity, invert panels and traffic signage.
机译:2001年,13,300英尺长的Anton Anderson纪念隧道(Aamt)开设了双路和铁路交通。 铁路的转换赢得了北美最长的道路隧道,这是美国土木工程师(Asce)的杰出项目和领导者(OPAL)的工程卓越的杰出民事成就奖。 AAMT改变了一个沿海社区的惠蒂尔经济,沿海社区60英里的安克雷奇,阿拉斯加。 随着隧道的成功结束原来的20年设计生活,阿拉斯加交通与公共设施(阿拉斯加Dot&PF)和阿拉斯加铁路公司(ARRC)寻求延长隧道的使用寿命。 本文介绍了地面支撑和排水系统的调查,设计和施工增强,由雪崩,应急发电机容量,反相板和交通标牌损坏的门户结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号