Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project

机译:Bracky Creek区域公用事业机构2阶段2原料送水系统项目

获取原文

摘要

The Brushy Creek Regional Utility Authority (BCRUA) is a partnership of the cities of Cedar Park, Round Rock, and Leander, Texas. The Phase 2 Raw Water Delivery System is a new deep water intake and conveyance system at Lake Travis. The estimated $160M project includes two lake taps with multilevel screens; a 9,000 linear feet (LF) gravity intake tunnel with a minimum 8-ft internal finished diameter concrete liner; an underground suction chamber with 6 well shafts; a 30-ft diameter, 300-ft deep construction access shaft; a 2,600 LF transmission tunnel with an 84-inch welded steel final liner; an exit shaft approximately 155 feet deep at the end of the transmission tunnel; a 145 million gallons per day (MGD) pump station with 10 pumps; and a maintenance building for chemical feed systems to the intake shafts. The majority of the underground work will be in limestone of the Glen Rose formation. Final design is underway with an anticipated bid date of June 2021 and a construction start date of January 2022. Major project elements, design developments, constraints, procurement methods, and project schedule are presented herein.
机译:Brushy Creek区域公用事业机构(Bcrua)是塞克萨斯州雪松公园,圆形岩石和Leander的城市的伙伴关系。第2阶段原料输送系统是特拉维斯湖的新型深水摄入和输送系统。估计的160万美元项目包括两个带有多级屏幕的湖泊水龙头; 9,000线性脚(LF)重力进气隧道,具有最小8英尺的内部成品直径混凝土衬里;带有6个井轴的地下吸入室; 30英尺直径,300英尺深构造进入轴;具有84英寸焊接钢最终衬里的2,600 LF传动隧道;在传动隧道末端大约155英尺的出口轴;每天14500万加仑(MGD)泵站,有10个泵;以及用于进气轴的化学进料系统的维护建筑。大多数地下工作将是格伦玫瑰地区的石灰岩。最终设计正在进行预期的6月2021年6月2022年的招标日期,1月2022年1月的施工开始日期。此处提出了主要项目要素,设计发展,限制,采购方法和项目时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号