首页> 外文会议>North American Tunneling Conference >Second Avenue Subway Project, New York: Design and Construction of the 96th Street Station
【24h】

Second Avenue Subway Project, New York: Design and Construction of the 96th Street Station

机译:第二大道地铁项目,纽约:第96街车站的设计和建设

获取原文

摘要

Phase 1 of the Second Avenue Subway is a $4.4 billion project. The first phase will consist of 3 new stations, one refurbished station, and TBM tunnels connecting the stations. Of the three new stations, 2 are mined (72nd St. and 86th St.), and the 96th St. Station is a cut-and-cover station located on the upper east side of the borough of Manhattan in New York City. This paper will discuss the design, planning, and construction of the 1500 foot long station at 96th Street. It will cover: slurry wall design and construction; temporary bracing and excavation, instrumentation and building monitoring; waterproofing; planning of entrance locations and ancillary buildings, and other aspects of building a cut-and-cover station in a densely populated urban environment.
机译:第二大道地铁的第1阶段是44亿美元的项目。第一阶段将包括3个新站,一个翻新站和连接站的TBM隧道。在三个新站中,2个是开采(第72号和第86 6 St),第96届圣站是一站,位于纽约市曼哈顿自治市镇的上东侧的剪切站。本文将讨论第96街1500英尺长站的设计,规划和建设。它将覆盖:泥浆墙设计和施工;临时支撑和挖掘,仪器仪表和建筑监测;防水;在密集的城市环境中规划入口处和辅助建筑物,以及建设剪辑站的其他方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号