Blue Lake Hydroelectric Expansion Project-Tunnel Excavations

机译:蓝湖水电膨胀项目隧道挖掘

获取原文

摘要

Conventional drill and blast methods were used to successfully excavate three new tunnels and two new shafts, employing typical rubber tired equipment and a mechanized raise climber, at the Blue Lake Expansion Project. The underground excavations were one phase of the ongoing $88 million Blue Lake Expansion Project owned by the City and Borough of Sitka, Alaska, a primarily fishing and tourism based community of approximately 10,000 residents located in southeast Alaska. Working in a remote island community accessible only by plane or boat presented many challenges. Underground excavations consisted of a 42.67 m (140 ft) long exploratory tunnel located 60.96 m (200 ft) from the base of the existing Blue Lake Dam, accessible only by crane; a 143.26 m (470 ft) long access adit developed to facilitate excavation of a 99.67 m (327 ft) surge shaft driven from the bottom up, using a Mechanized Raise Climber (MRC) breaking through in a remote surface location accessible by helicopter only; a 256.03 m (840 ft) long intake tunnel which portaled in 9.14 m (30 ft) above Blue Lake, Sitka's drinking water supply; and a 33.22 m (109 ft) gate shaft driven from the new intake tunnel, excavated with an MRC. This paper will provide a description of the logistical and engineering challenges involved with performing underground excavations in this isolated and demanding environment. Work areas accessible by crane and helicopter only, working directly above Sitka's drinking water supply, and excavating to within 9.14 m (30 ft) of the Blue Lake Dam and existing penstock tunnel are a few of the many factors which challenged this critical project.
机译:常规钻头和爆炸方法用于成功挖掘三种新的隧道和两个新轴,采用典型的橡胶疲劳设备和机械化升级登山者,在蓝湖扩展项目。地下挖掘是由市中心,阿拉斯加的锡尔塔,阿拉斯加州的休息区拥有的正在进行的8800万美元的蓝湖扩建项目的一阶段,该项目主要是渔业和旅游的社区,大约10,000名位于阿拉斯加东南部的居民。在偏远的岛屿社区工作,只有飞机或船只提供了许多挑战。地下挖掘包括42.67米(140英尺)长的探索隧道,距离现有的蓝湖坝底部60.96米(200英尺),只有起重机可访问; 143.26米(470英尺)长途接入Adit开发,以便于从自下而上从底部驱动的99.67米(327英尺)的喘振轴的挖掘,使用机械化的升级登山者(MRC)在直升机可访问的远程表面位置中突破; 256.03米(840英尺)长的进气隧道,在蓝湖上方9.14米(30英尺),Sitka的饮用水供应;和33.22米(109英尺)的门轴从新的进气隧道驱动,用MRC挖掘出来。本文将描述在孤立和苛刻的环境中执行地下挖掘所涉及的物流和工程挑战的描述。仅由起重机和直升机无障碍的工作区,直接工作在Sitka的饮用水供应之上,并挖掘到蓝湖大坝和现有的策划隧道的9.14米(30英尺)内是挑战这项关键项目的许多因素中的一些因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号