首页> 外文会议>North American Tunneling Conference >Design and Analysis Techniques for High Head Tunnel Plugs
【24h】

Design and Analysis Techniques for High Head Tunnel Plugs

机译:高头隧道插头的设计与分析技术

获取原文

摘要

The- Rondout-West Branch Tunnel supplies approximately half of New York City's drinking water and is leaking. A bypass tunnel is being designed around the leakage area. When complete, the bypass tunnel project will have three permanent concrete plugs, two of which will be installed by removing the existing lining from the leaking tunnel. This paper discusses plug design, with an emphasis on leakage-free criteria, shear key design, and construction considerations. The design was optimized by computational modeling, which provides insight into the plug behavior. The plug design is unique because of the schedule challenges and extreme hydrostatic loading condition of 36 bar.
机译:Rondout-West Branch隧道提供大约一半的纽约市的饮用水并泄漏。旁路隧道围绕泄漏区域设计。完成后,旁路隧道项目将有三个永久性混凝土插头,其中两个是通过从泄漏隧道中取出现有的衬里来安装的。本文讨论了插头设计,重点是无泄漏标准,剪切键设计和施工考虑。该设计由计算建模优化,这提供了对插头行为的洞察力。插头设计是独一无二的,因为时间表挑战和36巴的极端静水负载条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号