首页> 外文会议>North American Tunneling Conference >A Discussion on Design Methods to Improve Long-Term Performance of Tunnel Projects
【24h】

A Discussion on Design Methods to Improve Long-Term Performance of Tunnel Projects

机译:提高隧道项目长期绩效的设计方法探讨

获取原文

摘要

In the wake of the collapse of the ceiling panels in the I-90 section of the Central Artery/ Tunnel (CA/T) Project in 2006, the long term performance of tunnels became the focus of the tunneling industry. At the time of the accident, the tunnel had been open to traffic for about 10 years. This paper will discuss design methods and considerations to improve the long term performance and durability of a tunnel. The major problems found during the inspection of several tunnels will also be presented and the causes for these problems will be discussed.
机译:在2006年中央动脉/隧道(CA / T)项目的I-90段的天花板崩溃之后,隧道的长期表现成为隧道行业的重点。在事故发生时,隧道已开放到交通大约10年。本文将讨论改善隧道长期性能和耐用性的设计方法和考虑因素。还将展示检查多个隧道期间发现的主要问题,并将讨论这些问题的原因。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号