首页> 外文会议>International IMS Forum >Mid-term Multisite Production Planning: a new approach to manage demand uncertainty
【24h】

Mid-term Multisite Production Planning: a new approach to manage demand uncertainty

机译:中期多部生产计划:一种管理需求不确定性的新方法

获取原文

摘要

This paper is aimed at deepening the topic of mid-term production planning in a Multisite Production Network (MPN) in case of uncertain demand. In this regard, the first part of the paper is devoted to a present a review of related literature, with the purpose of highlighting how practitioners' and scholars' approaches to multisite stochastic planning can be matched together: this will be done by introducing a three layer planning framework, which will clarify the structure of this planning task. Then, in the second part of the paper, we will introduce a new criterion to deal with the first of these three layers. This new criterion, which is designed to isolated demand uncertainty within each product's demand, is put at work with a very simple configuration for the remaining two layers, and it is compared to a more traditional uncertainty management approach. A simulation study is performed and discussed, whose convincing results confirm the validity of the overall research framework, as well as of the proposed uncertainty management principle.
机译:本文旨在深化多型生产网络(MPN)中期生产规划的主题,以防不确定需求。在这方面,本文的第一部分致力于目前对相关文献进行审查,以突出从业者的方式突出显示对多站点随机规划的方法可以共同匹配:这将通过引入三个来完成图层规划框架,将阐明本规划任务的结构。然后,在纸张的第二部分,我们将介绍一个新的标准来处理这三层中的第一个。这种新的标准,该标准旨在在每个产品的需求中被孤立的需求不确定性,以非常简单的配置为剩余的两层进行工作,并且与更传统的不确定性管理方法进行比较。进行仿真研究,并讨论,其令人信服的结果证实了整体研究框架的有效性,以及提出的不确定性管理原则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号