首页> 外文会议>Society of Petroleum Engineers Asia Pacific Oil Gas Conference and Exhibition >New Zealand Gas Development Sets New Performance and Environmental Milestones Onshore and Offshore - The Role of Drilling Fluid Selection and Performance in the Pohokura Development
【24h】

New Zealand Gas Development Sets New Performance and Environmental Milestones Onshore and Offshore - The Role of Drilling Fluid Selection and Performance in the Pohokura Development

机译:新西兰天然气开发落地和海上设立了新的性能和环境里程碑 - 钻孔液选择和性能在Pohokura开发中的作用

获取原文

摘要

The Pohokura Gas Field lies off the West Coast of New Zealand in the Taranaki Basin. To develop this field, a total of nine wells were drilled, from both onshore and offshore locations. The extended-reach wells drilled from land set new records for New Zealand, drilling to a measured depth of 7,409 m (24,309 ft) on POW 03, the longest well. The five wells drilled from the offshore drilling unit featured tortuous well paths through the reactive and dispersive shales of the Taranaki Basin. The Pohokura reservoir sands are low-porosity "tight" sandstones, notoriously susceptible to fluid-related production impairment. In addition to these challenges, the onshore and offshore environmental regulations applied both by the local regulator and self-imposed by the operator are among the most strict in Asia. The fluids-specific challenges associated with this project included the design of a synthetic-based fluid and cuttings handling system that could maintain the fluid-on- cuttings discharge at the lowest practicable level, design of a highly inhibitive and lubricious water-based drilling fluid for the offshore drilling campaign, plus the development and testing of non-damaging drilling fluids for the reservoir sections of all wells. To achieve these goals, extensive laboratory testing and comprehensive reviews of field experience from other operations were undertaken. Key Performance Indicators were agreed between the operator and fluids provider. These benchmarks were reviewed on a well-by-well basis and used to facilitate ongoing continuous performance improvement.
机译:Pohokura气体领域位于塔拉纳基盆地的新西兰西海岸。要开发这个领域,从陆上和海上地点钻了总共九个井。延伸井从Land Set新的新西兰钻机钻探,钻探在Pow 03上的7,409米(24,309英尺)的测量深度,最长。从海上钻井单元钻出的五个井通过塔拉纳基盆地的反应性和分散的Shales精致的曲折井道。 Pohokura水库砂是低孔隙率“紧密”砂岩,令人惊叹的易受流体相关的生产障碍。除了这些挑战外,当地监管机构和经营者自我征收的陆上和近海环境法规是亚洲最严格的。与该项目相关的流体的特定挑战包括设计了一种基于合成的流体和切割处理系统,可以在最低实际水平下维持流体导通的放电,高度抑制和润滑水基钻井液的设计对于海上钻探运动,加上所有井的储层部分的非损坏钻井液的开发和测试。为实现这些目标,采取了广泛的实验室检测和对其他业务的现场经验的全面评价。关键绩效指标在运营商和流体提供者之间商定。这些基准在良好的基础上进行了审查,并用于促进持续的持续性能改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号