首页> 外文会议>Society of Petroleum Engineers Asia Pacific Oil Gas Conference and Exhibition >Development of the Gas Resource Assessment for the Papua New Guinea PNG LNG Project
【24h】

Development of the Gas Resource Assessment for the Papua New Guinea PNG LNG Project

机译:开发巴布亚新几内亚PNG LNG项目的天然气资源评估

获取原文

摘要

In December 2009, Esso Highlands Limited, a subsidiary of Exxon Mobil Corporation, and its partners made the decision to sanction the PNG LNG Project to develop resources in the Southern Highlands and Western Province of the Papuan fold belt. This project will develop four gas fields and blow down the gas caps of four currently producing oil fields. Resource assessments in the project area are only poorly characterized by the integration of 2D seismic, surface geology, well data, synthetic aperture radar (SAR) and aeromagnetic data. Integration of dynamic data has been critical in the development of the resource assessment, with approximately 80% of total resource supported by production and pressure data. The Hides Field with five reservoir penetrations is the key asset for the PNG LNG Project, supplying approximately 2/3 of the total project resource. Integrated structural mapping and comprehensive reservoir analysis in conjunction with pressure data sourced from existing wells defines the Hides volumes. Full field dynamic simulation models have been used to test the match to production history and determine the range of in-place and recoverable volumes. Comprehensive sensitivity analysis confirmed the validity of small amounts of production data to constrain the range volumes and demonstrated the resource robustness. A similar approach was applied at the Kutubu Main Block Toro (MBT) Field which has extensive well penetrations, production history and pressure data. Results of this work significantly narrowed the range of uncertainty in the Hides and Kutubu MBT resource and built confidence in the total resource base for the PNG LNG Project.
机译:2009年12月,Esso Highlands Limited,埃克森美孚公司的子公司及其合作伙伴决定批准PNG LNG项目,以开发南部高地和西部的拓荒腰带的资源。该项目将开发四个天然气场,并吹下四个目前生产油田的气体帽。项目区域的资源评估仅具有2D地震,地面,井数据,合成孔径雷达(SAR)和航空数据的整合。动态数据的集成对于资源评估的开发至关重要,其中大约80%的生产和压力数据支持的总资源。具有五个水库渗透的隐藏领域是PNG LNG项目的关键资产,提供总项目资源的大约2/3。综合结构映射和综合储层分析与来自现有井的压力数据结合使用,定义了隐藏量。完整的现场动态仿真模型已被用来测试与生产历史的匹配,并确定就地和可恢复卷的范围。综合敏感性分析证实了少量生产数据的有效性,以限制范围卷并证明资源稳健性。在Kutubu主块Toro(MBT)字段中应用了类似的方法,其具有广泛的渗透,生产历史和压力数据。这项工作的结果显着缩小了隐藏和库布MBT资源的不确定性范围,并建立了对PNG LNG项目的总资源基础的信心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号