Since the time of initial construction a series of cracks have developed through the Upper Stillwater Dam structure extending from the upstream face to the downstream face and vertically from the crest to the underlying bedrock foundation. A remediation program was implemented consisting of chemical grouting and for certain locations installing a membrane liner across the crack plane extending from the top of the dam into the underlying bedrock. The Upper Stillwater Dam Rehabilitation Project is unique primarily in the manner employed to construct the membrane slots, each 14-ft. long with a minimum opening width of 4.5 inches to depths of 158-ft, 182-ft, and 240-ft. respectively, as well as the design and implementation of the stainless steel membrane systems. Construction of a typical slot consisted of drilling a series of overlapping drill holes using a percussion drilling system modified with a unique guide system. An initial pilot hole was core drilled to the depth of the slot followed with a percussion drilling system fitted with a special guide sleeve designed to follow the profile of each sequential slot hole to ensure a high degree of verticality and bearing alignment with adjacent slot holes. The corrugated stainless steel membrane was designed for expansion based on the total movement of the crack throughout the seasonal temperature cycles. Finally, the upstream and downstream annular spaces of the slot-membrane are back-filled with a special hot asphalt/portland cement mixture specifically designed for adhesion to stainless steel and concrete, resilience, and expansion properties.
机译:由于初始构造的时间通过从上游面向下游面部延伸到下游面部的上部静止水坝结构以及从嵴到底层的基岩基础的上游坝结构开发了一系列裂缝。实施修复计划由化学灌浆组成,以及某些位置,用于将膜衬垫安装在从挡风机顶部延伸到底层基岩中。上部静止水坝康复项目主要是以用来构建膜槽的方式,每个14英尺。长度的最小开口宽度为4.5英寸,深度为158英尺,182英尺和240英尺。分别以及不锈钢膜系统的设计和实施。典型槽的构造包括钻出一系列重叠的钻孔,使用用独特的导向系统改装的打击乐钻系统。初始的先导孔是钻孔到槽的深度,然后采用打击钻系统,该系统配有特殊的引导套筒,该套管设计成跟随每个连续槽孔的轮廓,以确保高度的垂直性和与相邻槽孔的轴承对准。基于整个季节性温度循环的裂缝的总运动,设计了波纹不锈钢膜。最后,槽膜的上游和下游环形空间背部填充,具有专门设计用于与不锈钢和混凝土,弹性和膨胀性能的粘附性的特殊热沥青/波特兰水泥混合物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号