首页> 外文会议>POWER-GEN International Conference >Coordination and Collaboration – The Keys to Project Success A RICE Case Study(PPT)
【24h】

Coordination and Collaboration – The Keys to Project Success A RICE Case Study(PPT)

机译:协调与协作 - 项目成功的钥匙米案例研究(PPT)

获取原文

摘要

1.Rochester Public Utilities(RPU)needed peaking capacity.2.Focus on improving reliability,managing intermittent power,and planning for future growth.3.Solution-a clean,efficient,and flexible Reciprocating Internal Combustion Engine plant using W?rtsil? engines.? 4.RPU selected Westside Energy Partners(WEP),a joint venture of Sargent & Lundy and The Boldt Company for design and construction.Fixed and Variable Components: 1.10% of costs are fixed for design and general conditions.2.90% of total cost competitively bid with a fixed margin.3.Owner maintained contingency control.4.Complete cost transparency.Integrating a Lean Delivery:1.Free exchange of ideas to optimize design and execution,without compromising quality or craftmanship.2.Flexibility in work execution and material sourcing.3.Realtime RFI resolution.4.Optionality of equipment and material alternatives.5.Integration of documentation and quality control.6.More efficient project management allowing savings to create contingency funds or reinvest into the scope.
机译:1.彻底公用事业(RPU)需要达到峰值容量.2.Focus提高可靠性,管理间歇性电力,规划未来的增长.3。使用W 2的干净,高效,灵活的往复式内燃机厂?引擎。? 4.RPU选择了西边能源合作伙伴(WEP),Sargent&Lundy和Boldt公司的设计和建筑。修复和可变组件:1.10%的成本是设计和一般条件的规定.2.90%的总费用竞争力使用固定利率出价.3 .OWNER维护了upotience Control.4.1perete成本透明度。致贫认交货:1。免费交换思想,以优化设计和执行,而不会影响质量或工艺品.2.工作执行和材料中的符合性设备和文件以及质量的材料alternatives.5.Integration的sourcing.3.Realtime RFI resolution.4.Optionality control.6.More高效的项目管理功能,使节约创建应急资金或再投资于该范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号