首页> 外文会议>International Conference on Open Building >Open Building in Health Care Architecture: The Case of the INO Project in Bern, Switzerland
【24h】

Open Building in Health Care Architecture: The Case of the INO Project in Bern, Switzerland

机译:在医疗保健建筑中开放建筑:瑞士伯尔尼的INO项目的案例

获取原文

摘要

Located in Bern, the Inselspital is one of the oldest medical centers in Switzerland. It is a comprehensive university hospital whose physical facilities are managed by the Canton Bern Building Department. Several years ago, the hospital identified a need for a major renovation and new construction program. Based on an evaluation of past procurement methods that revealed their inability to prepare facilities with needed capacity for continual change, a decision was made to completely alter the methods it had used in the past. This led to a detailed "open building" planning process that produced a plan for a three-step competition for the new project - the INO - based on a distinction of decision levels. Each level corresponds to an expected period of optimum performance. The "Primary System" (base building) is intended for a 100-year performance period, the "Secondary System" (fit-out) for 20 years, and the "Tertiary System" (hospital equipment) for 5-10 years. The project is now under construction and is to be completed in 2007. As a result of this project, the Canton Building Department has decided to implement open building in its future projects. This paper reports on the project planning and its implementation-in-progress. The paper discusses the extent to which open building and lean construction principles are being applied to the design and construction of this large medical building, and comments on the rationale for adopting these methods more broadly.
机译:在伯尔尼小岛医院位于伯尔尼,是瑞士最古老的医学中心之一。这是一个综合性大学医院,其物理设施由伯尔尼州屋宇署管理。几年前,医院确定了需要进行重大改造和新建施工方案。基于那表明他们无法与不断变化的需要的能力准备设施过去的采购方法的评估,决定做出彻底改变它在过去使用的方法。这导致了一个详细的“开放建筑”规划过程中所产生的新项目包括三个步骤竞争计划 - INO - 基于决策水平的区别。每个级别对应于最佳性能的预期时期。 “主系统”(基地建设),适用于100年业绩期,“辅助系统”(FIT-OUT)为20年,5 - 10年的“第三系”(医疗设备)。目前该项目正在建设中,是在2007年作为该项目的结果完成,广州屋宇署已决定实施其未来的项目开建。本文拟对项目的规划和实施,正在进行的报告。本文讨论到开放建设和精益施工原则被运用到设计中,该大型医疗施工建设,和评论的理由更广泛地采用这些方法的程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号