首页> 外文会议>European Wind Energy Conference Exhibition >PREVIENTO meets HORNS REV Short-Term Wind-Power Prediction - as well for Offshore Sites
【24h】

PREVIENTO meets HORNS REV Short-Term Wind-Power Prediction - as well for Offshore Sites

机译:previento符合Horns Rev短期风力预测 - 以及离岸地点

获取原文

摘要

Excellent offshore conditions with mean windspeeds of more than 9 m/s in 62m height as well as shortage of onshore-sites motivate the current wind farm intentions in the North Sea. It will become vitally important to know the offshore electricity production two days in advance: Liberalised electricity markets call for reliable wind power predictions because balancing power is expensive. Previento is a wind power prediction system providing the expected power output of wind farms up to 72 hours in advance and is in operational use for German onshore sites. It includes advanced regional upscaling and in addition to the prediction an estimate of the uncertainty of the actual forecast. For offshore sites, wind power prediction tools have to deal with the special meteorological conditions over the sea. Important effects are in particular thermal air-sea interaction, a dynamic roughness length of the sea surface and the influence of the land-sea-discontinuity. How good is the wind speed forecast offshore? We present first promising results of short term wind speed predictions for potential offshore sites in the North Sea. For verification, we used recent measurements from Horns Rev and synoptic met-masts. Because of the presented high accuracy of the offshore wind speed forecast, Previento will allow for an economic grid integration of future offshore wind farms. Surprisingly, measured westerly winds from the sea show a larger wind shear compared to the logarithmic profile, in all thermal conditions. This fact might be due to a decreased thickness of the atmospheric Prandtl Layer over the sea. Further analysis is required and in progress.
机译:出色的离岸条件,平均风速超过9英米/秒,在62米的高度以及陆上站点的短缺促使当前风力农场意图在北海。提前两天的上海电力生产将变得对最重要的是:自由化电力市场要求可靠的风力电力预测,因为平衡功率昂贵。 PriveNiento是一种风电预测系统,提前提供最高72小时的风电场的预期电力输出,并在德国陆上站点运行使用。它包括高级区域上升,除了预测实际预测不确定性的估计之外。对于海上地点,风电预测工具必须在海上处理特殊的气象条件。重要效果特别是热海洋相互作用,海面的动态粗糙度和陆海不连续的影响。风速预测近海有多好?我们展示了北海潜在海上景点的短期风速预测的首次有希望的结果。为了验证,我们使用Horns Rev和Synoptic Met-Masts的最近测量。由于卓越的海上风速预测的高精度,ProviStOo将允许未来海上风电场的经济网格整合。令人惊讶的是,与对数型材相比,来自海的西风剪切显示出较大的风剪,在所有热条件下。这一事实可能是由于大海厚度下降的厚度。需要进一步分析和正在进行中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号