首页> 外文会议>European Wind Energy Conference Exhibition >Tendering procedures for the next offshore wind farms in Danish waters
【24h】

Tendering procedures for the next offshore wind farms in Danish waters

机译:丹麦水域下一个离岸风电场的招标程序

获取原文

摘要

Denmark has more than 10 years of experience dealing with offshore wind-power and today approximately 250 MW of offshore wind capacity is installed in Danish waters. It is expected that a total of more than 400 MW offshore wind-power capacity is installed in Denmark by the end of 2003. In total an area of approx. 1000 square kilometres has been pointed out as suitable for establishing offshore wind power in Danish waters, corresponding to the siting of 7000-8000 MW wind turbines. An important concern for the Danish government is to ensure that the future offshore development is based on market conditions in an economic efficient way. Therefore the Government decided to make preparation for tendering future offshore wind farms in Danish waters. By applying a tendering procedure competition among the bidders will be ensured and the most cost-effective offshore turbine developments will be undertaken. The preparation addresses the background for developing a tendering procedure for offshore wind farms in Danish waters and describes the tendering procedure in details including the expected time-horizon for establishing the next offshore farm and. Finally it, includes the findings of two economic scenarios for the future offshore wind power development.
机译:丹麦拥有10多年的经验,处理海上风力,今天约有250兆瓦的海上风力容量安装在丹麦水域。预计在2003年底,丹麦总共安装了超过400兆瓦的海上风力电力容量。总面积约为。已经指出1000平方公里,适用于在丹麦水域建立海上风力,对应于7000-8000 MW风力涡轮机的选址。丹麦政府的一个重要关注是确保未来的离岸发展是以经济有效的方式基于市场条件。因此,政府决定在丹麦水域准备招标未来的海上风电场。通过在投标人中申请招标程序竞争,将得到保证,并将进行最具成本效益的海上涡轮机发展。该制备解决了在丹麦水域开发海上风电场的招标程序的背景,并描述了细节中的招标程序,包括建立下一个离岸农场的预期时间范围。最后,包括两个经济场景的调查结果,为未来的海上风力发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号