Planning for Commercial Operation of the Honeymoon ISL Uranium Project

机译:规划蜜月ISL铀项目的商业运营

获取原文

摘要

A recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 1973 to 1979. Uranium mineralisation occurs in a coarse-grained unconsolidated sand aquifer located in the Yarramba Palaeochannel at a depth of approximately 110 m. Following initial development during 1979 to 1983 and the construction of demonstration leach facilities, the Project was put on hold. Southern Cross Resources purchased the Project in 1997. Government approval was received in March 1998 for the operation of on-site demonstration leach and recovery facilities while an Environmental Impact Statement was prepared and a 1000 tpa commercial production plant was designed. The Environmental Impact Statement (EIS) was released in June 2000 and operation of the test facility was completed in August 2000. Acceptance of the EIS by Commonwealth and South Australian state governments was announced on 20 November 2001. A Mining Lease was granted over the area of the proposed ISL operation on 8 February 2002. Operation of the Project is entirely dependent on using highly saline underground water resources to supply process and human needs. The management of discharge streams from the plant by re-injection was approved. The Honeymoon demonstration plant was the first adaptation of the solvent extraction process to highly saline in situ leach solutions. As such, it incorporated a number of unique operating and installation features. The trial period enabled optimisation of the process chemistry, additives and management and serves as an invaluable base for the proposed plant design and future operation. This paper discusses the nature of the uranium occurrence, the effect of saline water on the leach process and equipment, project design and environmental considerations, the requirements for disposal of discharge streams to minimise the impact on the arid environment and the requirements for rehabilitation following project completion.
机译:1971年,在南澳大利亚的蜜月发现了一种可收回的铀资源。在南澳大利亚发现,在南澳大利亚发现。在1973年至1979年的期间进行了矿床的探索。铀矿化发生在粗粒的未溶解沙子含水层中位于Yarramba Palaeochannel,深度约为110米。在1979年至1983年的初步发展之后以及演示浸出设施的建设,该项目被搁置了。南十字资源于1997年购买了该项目。1998年3月收到了政府批准,用于制定现场演示休闲和恢复设施,而制定了环境影响声明,设计了1000个TPA商业生产工厂。环境影响声明(EIS)于2000年6月发布,试验设施的运作于2000年8月完成。2001年11月20日宣布通过英联邦和南澳大利亚州政府的接受。在该地区授予采矿租赁在2002年2月8日拟议的ISL运作中。该项目的运作完全取决于使用高盐水地下水资源来供应过程和人类需求。通过重新注入的植物的放电流管理得到批准。蜜月示范厂是第一次适应溶剂萃取过程,以原位浸出溶液溶液高等盐水。因此,它包含了许多独特的操作和安装功能。试用期能够优化工艺化学,添加剂和管理,并为所提出的工厂设计和未来运作提供宝贵的基础。本文讨论了铀发生的性质,盐水对浸出过程和设备的影响,项目设计和环境考虑,处理排放流的要求最大限度地减少对干旱环境的影响以及项目后康复要求完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号