首页> 外文会议>International conference on inter-city transportation >ECONOMIC ANALYSIS, FINANCIAL ANALYSIS AND PROJECT STRUCTURE ON THE HIGH SPEED RAILWAY: CASE STUDY ON THE BEIJING SHANGHAI RAILWAY PROJECT
【24h】

ECONOMIC ANALYSIS, FINANCIAL ANALYSIS AND PROJECT STRUCTURE ON THE HIGH SPEED RAILWAY: CASE STUDY ON THE BEIJING SHANGHAI RAILWAY PROJECT

机译:高速铁路经济分析,财务分析与项目结构:北京上海铁路项目案例研究

获取原文

摘要

This paper presents the results of economic and financial analysis an examination and an evaluation of alternatives for a high-speed railway project structure with the example of Beijing-Shanghai high-speed railway in China. Two cases of enterprise are examined in the study. One is Ministry of Railways same as at present and another one is the independent enterprise. As the possession of infrastructure and operation, the case of the vertical separation type of and the vertical integration type of both of them is examined. The economic analysis shows that the high-speed railway would create the high economic efficiency and the social value. Financial analysis shows that the project would be feasible though it depends on the project structure. Moreover, qualitative evaluation items for selecting project structure are examined and alternatives are evaluated.
机译:本文介绍了经济和财务分析的结果,对中国北京上海高速铁路的例子进行了高速铁路项目结构的替代品的审查和评估。在研究中审查了两种企业案例。一个是铁路部,与目前相同,另一个是独立企业。作为拥有基础设施和操作,检查了垂直分离类型的情况和它们两者的垂直积分类型。经济分析表明,高速铁路将造成高经济效率和社会价值。财务分析表明,该项目将是可行的,但这取决于项目结构。此外,检查用于选择项目结构的定性评估项目,并评估替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号