首页> 外文期刊>中国铁路(英文版) >Beijing-Shanghai High-speed Railway Project
【24h】

Beijing-Shanghai High-speed Railway Project

机译:京沪高铁项目

获取原文
获取原文并翻译 | 示例
       

摘要

@@ 1 Brief Introduction of Projectrn1.1 GeneralrnThe Beijing-Shanghai high-speed railway is from Beijing South Station to Shanghai Hongqiao Station with a total length of 1,318 km. The railway will have a total of 21 stations including Beijing South Station, Tianjin West Station, Ji'nan West Station, Nanjing South Station and Hongqiao Station. The design speed is 350 km/h and the speed of initial stage operation is 300 km/h.
机译:@@ 1项目简介1.1总则京沪高铁从北京南站到上海虹桥站,全长1,318公里。铁路共有21个车站,包括北京南站,天津西站,济南西站,南京南站和虹桥站。设计速度为350 km / h,初始运行速度为300 km / h。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号