首页> 外文会议>IFAC Workshop on Manufacturing, Modelling, Management and Control >Scheduling cutting machines in a clothing industry
【24h】

Scheduling cutting machines in a clothing industry

机译:安排服装行业切割机

获取原文

摘要

In a clothing industry, clothes are produced by assembling fabric cutouts. Fabric rolls on a line, and is cut by automated machines arranged along the line. A fabric cutout f{sub}j, requiring time p{sub}j to be cut, is available for cutting on the first machine at a release date r{sub}j{sup}1, and must be completed, on the same machine, within a deadline D{sub}j{sup}1. On machine M{sub}i, i = 2,..., m, release dates and deadlines related to the cutout are r{sub}j{sup}i = r{sub}j{sup}1 + Δ(i - 1) and D{sub}j{sup}i= D{sub}j{sup}1 + Δ(i -1) respectively, where Δ is a constant factor depending on the speed rate of the fabric. A set-up time occurs on a machine, when switching from one cutout to another. The problem of assigning and scheduling cutting tasks to the minimum number of machines is addressed.
机译:在服装行业,衣服是通过组装织物切口制作的。织物在一条线上滚动,并通过沿线布置的自动化机器切割。需要切割时间P {sub} j的织物切口f {sub} j,可用于在发布日期r {sub} j {sup} 1上切割第一台机器,并且必须在同一地机器,在截止日期d {sub} j {sup} 1中。在机器m {sub} i中,i = 2,...,m,与切口相关的释放日期和截止日期是r {sub} j {sup} i = r {sub} j {sup} 1 +Δ(i - 1)和D {sub} j {sup} i = d {sub} j {sup} 1 +Δ(i -1),其中δ是根据织物的速度率的恒定因子。在从一个剪切到另一个切口切换时,在机器上发生设置时间。解决了向最小机器数分配和调度切割任务的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号