CHARACTERISTIC AND EXPERIENCE OF THE DESIGN, CONSTRUCTION AND PERFORMANCE OF TSQ-1 CONCRETE FACED ROCKFILL DAM

机译:TSQ-1混凝土面向堆坝坝设计,建筑和性能的特点和经验

获取原文

摘要

Construction of the 1800x10~4 m~3 TSQ-1 concrete faced rockfill dam on the nanpanjiang river in China, was completed in May 2000. Major design and construction and performance features of the project are described in the article. The Upper Tianshengqiao Hydropower Project (TSQ-1 project) is located on the Nanpanjiang river which is the border of Guizhou province and Guangxi Zhung Autonmous Region in China south-western. The project consists of an 178m high concrete faced rockfill dam, four power tunnels and penstocks, a surface power station, an intermediate outlet tunnel and an open cut spillway. The installed capacity of the power station is 1200MW. South corporation of State Power Corporation has taken charge of constructing and managing the project. The project started in 1991, and the first generating unit was commissioned in December 1998. The embankment of the dam started in February 1996, the embankment and concrete of face slab was completed in May 1999.
机译:2000年5月在中国南普江1800x10〜4 M〜3 TSQ-1混凝土面对堆石坝的建设,在2000年5月完成了该项目的主要设计和施工和性能特征。上天生桥水电项目(TSQ-1项目)位于南普江,是贵州省边界和中国西南部的广西振动地区。该项目由178米的高混凝土面向堆石坝,四个电源隧道和钢板,表面发电站,中间出口隧道和开放式切割溢洪道组成。电站的安装容量为1200MW。国家电力公司的南部公司负责构建和管理项目。该项目于1991年开始,第一个发电部门于1998年12月委托。大坝的堤防于1996年2月开始,1999年5月完成了脸板的堤防和混凝土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号