CRACKING IN LONG-SPAN PRESTRESSED CONCRETE AASHTO GIRGERS DURING PRODUCTION

机译:生产过程中的长期预应力混凝土烟草Girgers

获取原文

摘要

During the production of long-span AASHTO girders, full-depth vertical cracks have been observed within the mid-third of the girder before the prestressing strands are detensioned. The cracks run across the top flange transversely and extend downward through the web, reaching into the bottom flange of the girder. With the increasing use of high-performance concrete, more and more longer-span girders are used by bridge engineers. These girders would be more vulnerable to the cracking problem during their production. This paper presents the results of an investigation to determine the cause(s) of the cracking problem. It was found that the cracks developed due to restrained thermal contraction of the girders as well as the tendons during the cooling period following the overnight steam or heat curing. Recommended acceptance criteria for such cracked girders are discussed.
机译:在长期烟囱梁的生产过程中,在预应力股线被扭转之前,已经在梁中的三分之一内观察到全深度垂直裂缝。裂缝横跨顶部法兰横穿并横穿幅材向下延伸,达到梁的底部法兰。随着高性能混凝土的使用越来越多,桥梁工程师使用越来越多的跨度梁。这些梁在生产过程中将更容易受到破解问题。本文介绍了调查结果,以确定裂解问题的原因。发现,由于过夜蒸汽或热固化后冷却时段在冷却时段期间,由于狭窄的热收缩而产生的裂缝。讨论了推荐的验收标准的这种破裂梁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号