首页> 美国政府科技报告 >Cracking in Large-Sized Long-Span Prestressed Concrete AASHTO Girders
【24h】

Cracking in Large-Sized Long-Span Prestressed Concrete AASHTO Girders

机译:大型大跨度预应力混凝土aasHTO梁的开裂

获取原文

摘要

An investigation was conducted to study a cracking problem associated with theproduction of large-sized long span prestressed concrete AASHTO girders. During the production of these girders in the prestressing plant, vertical cracks often develop near the mid-third of the span after the girders have been cured overnight on the casting bed and before the prestressing strands are detensioned. The cracks would extend across the top flange of the girder transversely and penetrate vertically down through the girder web, reaching toward the bottom flange. The objective of the investigation was to identify the causes of the problem, and to develop and recommend its remedies. The research included a national survey of prestressed concrete producers to assess the status of the problem, a literature review of relevant issues, a series of laboratory and field studies to determine the condition of concrete and tendon force during the curing period, and an analysis of the girder under restrained thermal contraction.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号