首页> 外文会议>International conference on tunnels and underground structures >The assessment of limits for the movement of subway tunnels and trackwork due to adjacent construction
【24h】

The assessment of limits for the movement of subway tunnels and trackwork due to adjacent construction

机译:邻近施工引起的地铁隧道运动的限制评估

获取原文

摘要

The construction of the North East line has included the excavation of two interchange stations, up to 29.5m deep, near operational railway tunnels. Tunnelling under the operational tunnels followed the excavation. A detailed study of the tolerance of the existing track and tunnel structure to movement was carried out. This study formed the basis for decision making during construction. The methodology used in the study is given in outline. The study also helped to identify some simple measures which could be taken to reduce the risk during construction.
机译:东北线的建设包括两个交汇站的挖掘,深度近29.5米,靠近运营铁路隧道。在操作隧道下隧道挖掘挖掘。进行了对现有轨道和隧道结构对运动的公差的详细研究。本研究成立了建设期间决策的基础。研究中使用的方法在大纲中给出。该研究还有助于确定一些简单的措施,可以采取,以降低建设期间的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号