Characterization and Remedial Action At a Former MGP Adjacent to a Former Wood Treatment Operation Ashland, Wisconsin

机译:在威斯康星州前木治疗操作附近的前MGP的特征和补救措施

获取原文

摘要

Xcel Energy (formerly known as Northern States Power-Wisconsin (NSP)) is a successor to a power company that operated an MGP in Ashland, Wisconsin from 1885 until 1947. In 1989, the Wisconsin Department of Natural Resources (WDNR) responded to reports of creosote contamination on city property located between the former MGP and Lake Superior, claiming that the former MGP site was the contaminant source. However, other identified potential sources included former wood treatment operations as well as a former solid waste disposal facility located at the city property. Subsequent investigations identified dense non-aqueous phase liquid (DNAPL) contamination in sediments nearly 700 feet beyond the shoreline, at the lakefront (a city park), in a shallow "fill" aquifer, and in a deep confined aquifer at the former MGP site. DNAPL is present in all of these media. In 1998, the WDNR's consultants recommended a $50 million alternative for remediation of the lakefront and offshore sediments, largely consisting of an approximate 20 acre cap, requiring filling of the offshore area. WDNR allowed NSP to submit alternative recommendations for the lakefront and offshore sediments, along with recommendations for remediation at the former MGP property. This alternative remedial evaluation for the lakefront resulted in recommendations for a reduced capping option for the sediments, along with hot spot (DNAPL) removal and groundwater treatment at the Lakefront Park. These alternatives were estimated to cost approximately $15 million. Concurrently, NSP recommended remedial actions for the former MGP site that included capping of the upper aquifer, in conjunction with installation of a tar removal system for the deeper confined aquifer. The estimated cost for these alternatives was about $3 million. At the time these remedial technology evaluations were submitted to the WDNR, a private citizens group petitioned Region V of USEPA for listing the site on the National Priorities List (NPL). That process has recently been completed, and the site has been added to the federal NPL. Although this process has delayed remedial efforts, the WDNR approved NSP's recommendation to implement a tar removal system for the deep aquifer at the former MGP site as an Interim Action. This system was constructed during the summer of 2000. It is currently removing and separating product from the recovered groundwater, treating the residual groundwater prior to discharge to the sanitary sewer.
机译:Xcel能源公司(前身为北方国电威斯康辛(NSP))是一个继任者是操作阿什兰的MGP,威斯康星州1885年至1947年。1989年,电力公司,自然资源威斯康星州(WDNR)回应报道对位于前MGP和苏必利尔湖之间,声称前者MGP网站是污染源城市物业杂酚油污染。然而,其它识别的潜在来源包括前木材处理业务,以及位于城市物业前固体废物处置设施。随后的调查,在原MGP现场鉴定密非水相液体(DNAPL)污染沉积物中将近700英尺以外的海岸线,在湖边(城市公园),在浅“填充”含水层,并在深层承压含水层。 DNAPL出现在所有这些媒体。 1998年,WDNR的顾问建议在湖畔和近海沉积物的整治5000万$的替代,这主要是由近似20英亩盖的,需要近海区域的填充。 WDNR允许NSP在前者MGP属性为湖畔和近海沉积物提交替代建议,并建议沿着整治。在湖畔这个替代补救评估导致了对沉积物降低封盖的选择建议,与热点(DNAPL)去除和地下水处理的湖畔公园一起。这些替代品估计将耗资约1500万$。同时,NSP推荐,其中包括在安装中焦油去除系统的更深层次的承压含水层封盖上部含水层,结合前MGP网站的补救措施。使用这些替代品的费用估计约为$ 3百万。在这些补救技术评估已提交给WDNR的时候,一个普通公民请愿团美国环保局五区上市的国家优先项目清单(NPL)的网站。这个过程最近已经完成,该网站已被添加到联邦不良贷款。虽然这个过程已经推迟采取补救措施,在WDNR批准NSP的建议实行焦油去除系统在原MGP网站作为一个临时行动的深层含水层。该系统的2000它当前移除和从回收的地下水中分离产物,前放电处理残余地下水到下水道在夏季构建。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号