Xcel Energy (formerly known as Northern States Power-Wisconsin (NSP)) is a successor to a power company that operated an MGP in Ashland, Wisconsin from 1885 until 1947. In 1989, the Wisconsin Department of Natural Resources (WDNR) responded to reports of creosote contamination on city property located between the former MGP and Lake Superior, claiming that the former MGP site was the contaminant source. However, other identified potential sources included former wood treatment operations as well as a former solid waste disposal facility located at the city property. Subsequent investigations identified dense non-aqueous phase liquid (DNAPL) contamination in sediments nearly 700 feet beyond the shoreline, at the lakefront (a city park), in a shallow "fill" aquifer, and in a deep confined aquifer at the former MGP site. DNAPL is present in all of these media. In 1998, the WDNR's consultants recommended a $50 million alternative for remediation of the lakefront and offshore sediments, largely consisting of an approximate 20 acre cap, requiring filling of the offshore area. WDNR allowed NSP to submit alternative recommendations for the lakefront and offshore sediments, along with recommendations for remediation at the former MGP property. This alternative remedial evaluation for the lakefront resulted in recommendations for a reduced capping option for the sediments, along with hot spot (DNAPL) removal and groundwater treatment at the Lakefront Park. These alternatives were estimated to cost approximately $15 million. Concurrently, NSP recommended remedial actions for the former MGP site that included capping of the upper aquifer, in conjunction with installation of a tar removal system for the deeper confined aquifer. The estimated cost for these alternatives was about $3 million. At the time these remedial technology evaluations were submitted to the WDNR, a private citizens group petitioned Region V of USEPA for listing the site on the National Priorities List (NPL). That process has recently been completed, and the site has been added to the federal NPL. Although this process has delayed remedial efforts, the WDNR approved NSP's recommendation to implement a tar removal system for the deep aquifer at the former MGP site as an Interim Action. This system was constructed during the summer of 2000. It is currently removing and separating product from the recovered groundwater, treating the residual groundwater prior to discharge to the sanitary sewer.
机译:Xcel Energy(以前称为北威州电力公司)是1885年至1947年在威斯康星州阿什兰市运营MGP的电力公司的继任者。1989年,威斯康星州自然资源部(WDNR)对报告做出了回应在前MGP和苏必利尔湖之间的城市财产上的杂酚油污染,声称前MGP场地是污染源。但是,其他确定的潜在来源包括以前的木材处理业务以及位于城市物业的以前的固体废物处理设施。随后的调查发现,在海岸线附近近700英尺处,湖畔(城市公园),浅层“填充”含水层以及前MGP站点的深密闭含水层中的沉积物中,存在浓稠的非水相液体(DNAPL)污染。 。 DNAPL存在于所有这些介质中。 1998年,WDNR的顾问推荐了5000万美元的替代方案,以修复湖滨和近海沉积物,其中大部分由大约20英亩的顶盖组成,需要填充近海区域。 WDNR允许NSP提交有关湖滨和近海沉积物的替代建议,以及对原MGP物业进行补救的建议。对湖滨进行的这种替代性补救评估得出的建议是减少沉积物的封盖方案,并建议去除湖滨公园的热点(DNAPL)和进行地下水处理。这些替代品估计花费约1500万美元。同时,NSP建议对前MGP场址采取补救措施,包括封盖上部含水层,并为更深的受限含水层安装焦油去除系统。这些替代品的估计费用约为300万美元。在将这些补救技术评估提交给WDNR时,一个私人公民团体向USEPA的V区提出申诉,要求将该网站列入“国家优先事项列表”(NPL)。该过程最近已完成,并且该站点已添加到联邦NPL。尽管此过程延迟了补救工作,但WDNR批准了NSP的建议,即在临时MGP现场为深水层实施焦油去除系统。该系统于2000年夏季建成。目前,它正在从回收的地下水中去除和分离产品,在将剩余的地下水排放到下水道之前对其进行处理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号