In 1975 two companies were competing for the opportunity to design and build a major pipeline system to carry natural gas from the North Slope of Alaska and the Beaufort Delta to markets in Canada and the USA. The routes proposed and the design concepts differed between the companies but both required many large compressor stations and were in consequence a magnet to the gas turbine industry. Competition for a share in the potentially lucrative business was intense and attracted all of the major suppliers. Both heavy frame and aero-derivative units were offered and these came with varying degrees of operating experience. Some units were well proven in pipeline service while other units were no more than prototypes. The project had a high political profile with sponsors both in Canada and the United States, therefore, international as well as national interests were involved. The selection of the most appropriate compressor units for this project, became an issue of some importance. It therefore became necessary to develop a process that was not only technically and commercially rigorous but was also totally transparent. The development of this process is described in reference 1. One of the two competing pipeline companies was forced out of business in 1977 because of environmental and social and economic concerns related to the proposed route. The other company developed a more acceptable route, and although the total pipeline system from the Arctic was never constructed, a section from central Alberta to the 49th parallel was completed in 1982. Although this portion was small compared to the total filed system it did require the construction of four compressor stations. Since that time a great deal of operating experience has been gained and as a consequence some modifications are suggested to simplify and up date the selection process. The purpose of this Paper is to re-examine the methodology originally developed and review the results of decisions made then in relation to the subsequent experience gained through operation of the pipeline.
机译:1975年,两家公司正在竞争设计和建造一个主要管道系统的机会,将自然气体从阿拉斯加北坡和加拿大和美国的市场携带到博览会。所提出的路线和设计概念不同,而且公司都有许多大型压缩机站,因此是燃气轮机行业的磁铁。在潜在利润丰厚的业务中竞争激烈并吸引了所有主要供应商。提供了重型框架和航空衍生单位,这些单位具有不同程度的操作经验。有些单位在管道服务中得到了很好的证明,而其他单位则不超过原型。该项目与加拿大和美国的赞助商具有高度政治简介,因此,涉及国际和国家利益。选择该项目最合适的压缩机单元,成为了一些重要的问题。因此,它变得有必要制定一个不仅在技术上和商业上严格但也完全透明的过程。该过程的发展是参考文献中的1.由于与拟议路线相关的环境和社会和经济问题,这两个竞争管道公司之一被迫在1977年被迫失业。另一家公司开发了一个更可接受的路线,虽然来自北极的总管道系统从未建造过,从中央阿尔伯塔省到第49平行的一部分于1982年完成。虽然该部分与它所需的总申请系统相比很小四个压缩机站的构造。从那时起,已经获得了大量的运营经验,因此建议简化和升级选择过程的一些修改。本文的目的是重新检查最初开发的方法,并审查决策的结果,然后在通过管道运营中获得的后续经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号