首页> 外文会议>Randol gold silver forum >THE PIERINA PROJECT: LEACHNG OF HIGH GRADE ORE
【24h】

THE PIERINA PROJECT: LEACHNG OF HIGH GRADE ORE

机译:Pierina项目:高档矿石的Leachng

获取原文

摘要

The Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of acquisition, Arequipa had developed two exploration tunnels and drilled 9 exploration holes on the property. Metallurgical tests, conducted on samples taken from the tunnels and the exploration holes indicated that the ore was amenable to heap leaching. Barrick's senior management that this was indeed a world class deposit that should be pursued. On November 25, 1998, the first dore was poured at Pierina, 27 months from the time of acquisition. During that period Barrick completed its exploration programme, prepared a development plan including capital and operating cost, production profiles and cash flow forecasts, and a schedule to develop a mine and construct a leach pad and gold recovery plant, including all supporting infrastructure. All permits and environmental approvals were obtained and all necessary land was acquired. The project was completed on schedule and under budget. This was the first greenfield mine development for Barrick outside of North America. This paper details, mainly, the research and development, engineering, construction and commissioning of the metallurgical process facilities.
机译:Pierina押金于1996年8月收购,当时普里克金公司购买了秘鲁大型矿业公司的阿雷基帕资源。在收购时,阿雷基帕开发了两种勘探隧道,并在该物业上钻了9个勘探孔。在从隧道和勘探孔中取出的样品上进行的冶金测试表明,矿石可享受堆浸出。巴里克的高级管理层认为这确实是应该追求的世界级押金。 1998年11月25日,从收购时27个月涌入Pierina的第一个昏昏欲睡。在此期间,Barrick完成了勘探计划,编写了一个开发计划,包括资本和运营成本,生产简介和现金流量预测,以及开发矿井的时间表,建造浸出垫和金回收厂,包括所有支持基础设施。获得了所有许可和环境批准,并获得了所有必要的土地。该项目按计划和预算完成。这是北美境外的滨谷店的第一个Greenfield Mine开发。本文详述,主要是研究开发,工程,建设和调试冶金工艺设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号