首页> 外文会议>North American tuneling : conference and exhibition >Hollywood Water Quality Improvement Project construction
【24h】

Hollywood Water Quality Improvement Project construction

机译:好莱坞水质改善项目建设

获取原文

摘要

This paper describes the history leading up to the project, the construction methods, significant events and the principal elements of the system. The project setting, community involvement and environmental aspects are a large consideration for this project located in the heart of the Hollywood Hills under the famous Hollywood sign. The work is taking place in an environmentally sensitive area adjacent to the Upper and Lower Hollywood Reservoirs, which supply the drinking water for 500,000 people. The Department has placed a high emphasis on community involvement to facilitate construction, including building of a dedicated access road to minimize the construction traffic through the neighborhood. The project consists of two world-class size 30 million gallon storage tanks, a 10-foot diameter 6,000 foot long bypass tunnel, a 6-foot diameter 1,200 foot long utility tunnel, underground connection to the existing Weid tunnel and associated piping and mechanical facilities.
机译:本文介绍了导致项目的历史,施工方法,重大事件和系统的主要元素。项目环境,社区参与和环境方面是针对这个项目位于好莱坞着名的好莱坞标志的好莱坞山城的巨大考虑因素。这项工作正在与上下好莱坞水库相邻的环境敏感区域中,为饮用水供应500,000人。该部门向社区参与提供了重视,以促进建设,包括建设专门的通道道路,以最大限度地通过附近减少施工交通。该项目由两名世界级大小3000万加仑储罐组成,10英尺直径6000英尺长的旁路隧道,6英尺直径1,200英尺长的公用事业隧道,地下连接到现有的Weid隧道和相关管道和机械设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号