首页> 外文会议>International Body Engineering Conference and Exposition >The process assurance body build systems tooling build/plate build what are the benefits?
【24h】

The process assurance body build systems tooling build/plate build what are the benefits?

机译:该过程保证身体构建系统工具构建/板块构建有哪些好处?

获取原文

摘要

An assessment of body-in-white quality and launch preparedness occurs at many intervals. This paper will focus on dimensional control activities that take place during the first pre-production pilot phase known as P0. (P-zero occurs approximately 35 weeks before volume production.) Two process assurance body build systems (tooling build and plate build) have been used at Chrysler and the results have been documented. The plate build and tooling build activities provide the opportunity to uncover and resolve product design and part quality issues. In addition, the tooling build process has proven to be an objective method of identifying and correcting tooling, gaging and process issues during the P0 vehicle build program.
机译:每隔多间隔发生对身体质量和发射准备的评估。本文将专注于在称为P0的第一个预生产导段阶段进行的尺寸控制活动。 (P-ZEON大约发生在批量生产前大约35周。)在克莱斯勒使用了两种过程保证身体构建系统(工具构建和板材构建),并记录了结果。板材构建和工具构建活动提供了揭示和解决产品设计和部分质量问题的机会。此外,该工具构建过程已被证明是在P0车辆构建程序期间识别和纠正工具,手术和过程问题的客观方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号