The Integrated Systems Testbed (ISTB): Lessons Learned from the 1999 Prototype Demonstration Activities

机译:集成系统测试(ISTB):从1999年的原型演示活动中汲取的经验教训

获取原文
获取外文期刊封面目录资料

摘要

The 1999 Integrated Systems Testbed (ISTB) Independent Research and Development (IR&D) program established the foundation for a Raytheon Company distributed simulation testbed and supporting infrastructure. Modeling and Simulation (M&S) experts from the various Raytheon business segments worked together to support the IR&D program objectives. The primary goal of the program is to design, develop, and demonstrate a distributed testbed architecture, an executable framework, ancillary tools, process and services. The ISTB will provide an environment for any business unit within Raytheon to prototype and demonstrate new system requirements or to evaluate performance of existing systems. The ISTB will also provide the facility and infrastructure to demonstrate new combinations of systems (systems of systems) through modeling and simulation. The 1999 program served as a catalyst for combining the legacy M&S capabilities while serving as a demonstration of the benefits that can be achieved through multi-business segment collaboration. Two major program milestones, Demonstration #1, August 1999, and Demonstration #2, December 1999, were conducted to show proof of the collaboration and current testbed capabilities. This paper will focus on the lessons learned in planning, designing, developing, integrating, and testing activities of the ISTB 1999 Demonstration activities. We will discuss special considerations for configuring the HLA Run Time Infrastructure (RTI) for use over a large country-wide WAN, creating a FOM based on disparate legacy federations, and making multi-business segment legacy simulations inter-operate.
机译:1999年的综合系统试验台(ISTB)自主研发的(IR&d)计划建立一个美国雷神公司分布式仿真测试平台和配套设施的基础。建模和各种雷神业务板块仿真(M&S)的专家一起工作,支持IR&d计划目标。该计划的主要目标是设计,开发和示范分布式测试平台架构,可执行的框架,辅助工具,过程和服务。该ISTB将为雷神内任何业务单元为原型,展示新的系统要求或评估现有系统的性能的环境。该ISTB还将提供设施和基础设施,通过建模和仿真展示系统(系统的系统)的新组合。 1999年计划起到了催化剂的组合,同时担任的,可通过多业务领域的合作获得的成果示范遗留M&S能力。两个主要项目里程碑,示范#1,1999年8月,示范#2,1999年12月,进行了以显示协作和当前的测试平台能力的证明。本文将重点讨论规划的经验教训,设计,开发,集成和测试1999年ISTB示范活动的活动。我们将讨论特殊注意事项配置使用的HLA运行时间框架(RTI)在一个大的全国性的广域网,创建一个基于完全不同的传统联盟一个FOM,并使多业务领域的传统模拟,操作间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号