TESTING OF GT8C2 SERIAL NUMBER ONE AT THE ALSTOM POWER GT TEST FACILITY, BIRR, SWITZERLAND

机译:测试GT8C2序列号在Alstom Power GT测试设施,瑞士Birrom

获取原文

摘要

Construction at the Birr test facility started in late summer of 1999 with the goal of installing and testing the first GT8C2 in Switzerland before delivering any GT8C2 at a customer's site. Hot commissioning and consequently testing of the unit started less than half a year after the start of construction. Within a few days from motor roll idle was reached without any problems worth mentioning. Good run up characteristics of the gas turbine and excellent operational behavior of the machine were confirmed. The first part of the paper describes the test results regarding performance as well as other parameters affecting daily operation of the GT power plant. The second part of the paper describes the findings and conclusions regarding packaging, including suitability for fast track projects.
机译:Birr测试设施的建设始于1999年夏季,目的是在客户网站提供任何GT8C2之前在瑞士安装和测试第一个GT8C2。热调试并因此测试该单位的测试在施工开始后不到半年。在几天之内,从电机滚动怠速达到,没有任何值得一提的问题。确认了燃气轮机的良好燃气涡轮机的特点,并确认了机器的优异操作行为。本文的第一部分描述了关于性能的测试结果以及影响GT发电厂日常操作的其他参数。本文的第二部分介绍了关于包装的调查结果和结论,包括适合快速轨道项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号