首页> 外文会议>Conference on optical telescopes of today and tomorrow >Software engineering for the Keck II Telescope Control System
【24h】

Software engineering for the Keck II Telescope Control System

机译:Keck II望远镜控制系统的软件工程

获取原文

摘要

The Keck II telescope control system is a completely new design from the Keck I system. The entire software project, design, implementation and commissioning, has taken 16 months from inception in January 1995 to completion of all major subsystems in April 1996. First light took place in January 1996, and scientific quality images were taken in April 1996. Full operations are planned for October 1996. This paper focuses on the management and software engineering practices and the software tools that made it possible to complete a project of this magnitude with the limited time and resources at our disposal. Areas of potential software sharing and collaboration with other observatories are also discussed.
机译:Keck II望远镜控制系统是凯克I系统的全新设计。整个软件项目,设计,实施和调试,从1995年1月开始完成16个月,以完成1996年4月的所有主要子系统。1996年1月举行的第一盏灯,1996年4月进行了科学质量的形象。全部运营计划于1996年10月。本文重点介绍管理和软件工程实践和软件工具,使得可以随时随地完成有限的时间和资源项目的项目。还讨论了潜在的软件共享领域和与其他观察者的合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号