Barriers to Implement Building Information Modeling (BIM) in Public Projects in Saudi Arabia

机译:在沙特阿拉伯公共项目中实施建筑信息建模(BIM)的障碍

获取原文

摘要

The construction sector is a major contributor to the Saudi Arabia Gross Domestic Product (GDP). According to the Deloitte 2015, the total construction activities last year reach to $24bn ranked second after oil industry [1]. However, the current methods project are follow generates much waste and are not efficient. The recent 2030 vision plan that announced by the government of Saudi Arabia in 2016 encourages all sectors to be creative, efficient, and environmentally responsible. Technology such as Building Information Modeling (BIM) could help transform the construction industry in Saudi Arabia and improve the final outcomes. This study develops and administrates a questionnaire to identify the barriers of implementing the BIM technology in Saudi Arabia. Additional barriers are also identified through a case study for a public project after implementing BIM trough the feasibility and the design phase. The barriers are fallen under tow categories including; process implementing which comes first and technology and resources that come second.
机译:建设部门是沙特阿拉伯国内生产总值(GDP)的主要贡献者。据德勤2015年,去年的总建筑活动达到240亿美元的石油工业后第二次[1]。但是,目前的方法项目被关注产生太多的浪费并且不高效。最近由沙特阿拉伯政府于2016年宣布的2030年愿景计划鼓励所有部门创造性,高效,环保负责。建筑信息建模(BIM)等技术可以帮助改变沙特阿拉伯建筑业,并改善最终结果。本研究开发并管理问卷,以确定在沙特阿拉伯实施BIM技术的障碍。在实施BIM槽的可行性和设计阶段之后,还通过对公共项目进行案例研究来确定额外的障碍。障碍障碍在拖尾类别下倒下,包括;进程实施,它是第一和第二种技术和资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号