首页> 外文会议>International Conference on Applied Human Factors and Ergonomics >An Analysis of the Start-up Delay and Safety for Signalized Intersections: Impact of Left-Turn Phasing Sequences
【24h】

An Analysis of the Start-up Delay and Safety for Signalized Intersections: Impact of Left-Turn Phasing Sequences

机译:信号交叉点启动延迟和安全性分析:左转阶段序列的影响

获取原文

摘要

This paper aims to investigate the start-up delay at signalized intersections in Abu Dhabi (AD) city, UAE. The impact of some external factors that may affect the start-up delay in examined including; left turn phasing sequences (split/lead/lag), movement turning (through/left), intersection location (CBD/non-CBD) and day time (peak/off-peak). The paper also addressed the impact of illustrating lead/lag phasing system on the performance of traffic and safety. A significant number of observations were obtained by using automated license plate recognition cameras at 66 different intersection approaches. The results show that the estimated mean value of the start-up delay is 2.201 s with a standard deviation of 1.823 s. In conclusion, the statistical tests show significant difference in start-up delay the have between observed for through, left, at CDB and non-CDB area and between split and lead/lag phasing. However, no significant difference between peak and off-peak periods and between split and lead phasing are recognized. In addition, the lead/lag phasing improved the traffic performance by reducing the total delay at intersections but has a negative impact on the safety.
机译:本文旨在调查阿布扎比(广告)市中心的信号交叉口的启动延迟。一些外部因素的影响可能影响审查的启动延迟,包括;左转阶段序列(分裂/引导/滞后),移动转动(通过/左),交叉点(CBD /非CBD)和日时(峰/偏峰)。本文还解决了说明铅/滞阶段阶段对交通和安全性能的影响。通过在66种不同的交叉点接近使用自动牌照识别摄像机获得了大量观察。结果表明,启动延迟的估计平均值为2.201秒,标准偏差为1.823秒。总之,统计测试显示出在CDB和非CDB区域的观察到,在CDB和非CDB区域之间以及分裂和引导/滞后阶段之间的初始延迟的显着差异。然而,峰值和非峰值周期和分裂和铅相位之间没有显着差异。此外,通过降低交叉点的总延迟但对安全产生负面影响,引线/滞后阶段改善了交通性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号