首页> 外文会议>IFAC Conference on Manufacturing Modelling, Management, and Control >Reducing production cycle time by ergonomic workforce scheduling
【24h】

Reducing production cycle time by ergonomic workforce scheduling

机译:通过符合人体工程学劳动力调度减少生产周期时间

获取原文

摘要

Job rotation and allocation problems play important roles in the workforce scheduling domain. In this paper, the ergonomic considerations are employed for determining an efficient workforce schedule for a given planning period. This schedule contains both worker assignment and rotating among the workstations in a production line. Ergonomic adequation level between job and operator is the basis for the assignment. The studied production system is a continuous assembly line that must work all seven days a week. In the research, the main objective is to analyse the impact of the adequation level between workers and jobs on the operation time of the operators. In this way, an integer linear mathematical model is proposed to reduce the daily production cycle time by an ergonomic workforce scheduling. The model is solved by applying an optimization software named GUROBI. The output of the model is an optimal ergonomic worker assignment to different posts that can be changed from a day to another during a given planning period.
机译:作业旋转和分配问题在员工调度域中扮演重要角色。在本文中,采用了符合人体工程学考虑来确定给定规划期的有效劳动力计划。此计划包含工人分配并在生产线中的工作站之间旋转。工作和运营商之间的人体工程学性充足水平是作业的基础。研究的生产系统是一个连续装配线,必须每周七天工作。在研究中,主要目标是分析工人与就业人员之间的充分水平对运营商的运作时间的影响。以这种方式,提出了整数线性数学模型,以通过符合人体工程学的劳动力调度来减少日常生产周期时间。通过应用名为Gurobi的优化软件来解决该模型。该模型的输出是对不同帖子的最佳符合人体工程学工作者分配,可以在给定的规划期间从一天变为另一个帖子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号