首页> 外文会议>International Conference on Civil Engineering and Materials Science >The dilemma and situation of detention pond in terms of extreme climate-a case study of Baoyeli detention pond
【24h】

The dilemma and situation of detention pond in terms of extreme climate-a case study of Baoyeli detention pond

机译:极端气候拘留池的困境与情况 - 以百茂拘留池塘为例

获取原文

摘要

Constructing detention ponds to prevent flood has become a trend in recent years,but the utility of detention pond is yet to be confirmed.Therefore,in this study,we investigate detention pond's function in terms of flood solving by analyzing the rainfall data,and comprehending the dilemma of detention pond in technology,also,we interview the user of detention pond to know the ordeal of detention pond in politic.We discover that detention pond is very effective in making up for the weaknesses in the drainage system,however,detention pond isn't very effective in improving the overall flood control capacity of the drainage system.Furthermore,government needs to outreach policies to solve misunderstanding of public on infrastructures.
机译:构建拘留池预防洪水已成为近年来的趋势,但拘留池的效用尚未得到证实。因此,在这项研究中,我们通过分析降雨数据来调查拘留池的功能,并通过分析降雨数据,理解拘留池中的困境,此外,我们采访了拘留池的用户来了解政治拘留池的折磨。我们发现拘留池非常有效地弥补排水系统的弱点,但是拘留池塘在提高排水系统的整体防洪能力方面并不是很有效。繁多,政府需要外联政策,以解决公众对基础设施的误解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号