(5)Development of the Albion Process plant to treat refractory concentrates from the gpm Gold Project

机译:(5)开发Albion过程植物,以从GPM金项目处理难治性浓缩物

获取原文

摘要

The GPM Gold Project is located in Armenia, and consists of an open cutmine at Zod, near the Azerbaijan border, and a CIL processing plant atArarat near the Turkish border. Mining at Zod commenced in 1976, andfocused on near surface oxide ores, which overlay deeper refractory sulfides.Historical mining has now almost depleted the oxide ores, and the sulfidecontent of ore delivered to the processing plant at Ararat is increasing. Goldand silver recoveries through the Ararat plant are declining.GeoProMining, the owners of the project, are expanding the Araratfacility to deal with the increasing sulfide content in the ore. GeoProMiningare refurbishing an existing concentrator to recover a sulfide concentratefrom the ore, and are constructing an Albion Process plant to oxidize therefractory concentrate. Xstrata Technology (XT) is providing the AlbionProcess plant as a technology package.Run of mine ore will be ground and subjected to flotation to produceapproximately 100,000 tonnes per annum of an 18% w/w sulfide concentrateand 900,000 tonnes per annum of flotation tailings. The Albion Processplant will oxidize the sulfide concentrate, to liberate gold and silver forrecovery. The oxidized concentrate and flotation tailings will berecombined and processed through the existing CIL plant to recover over90% of the gold and 85% of the silver as dore from run of mine ore.Construction of the Albion Process plant is nearing completion andplant commissioning will begin in March/April, 2014.
机译:GPM Gold项目位于亚美尼亚,由Zod的开放式豆章组成,靠近阿塞拜疆边境,以及土耳其边境附近的CIL加工厂Atararat。在Zod开采于1976年,并在近氧化物矿石上繁殖,覆盖较深的耐火硫化硫化物。博物馆挖掘现在几乎耗尽了氧化物矿石,并且在亚拉沙拉省在ararat递送到加工厂的磺化程度正在增加。通过Ararat植物的Goldand Silver Resepies正在下降。项目的所有者正在扩大araratfacility以处理矿石中硫化物含量的增加。 GeoProminingare翻新现有的浓缩器以从矿石中回收硫化物浓缩物,并且正在构建含汉代工艺植物以氧化不可终止浓缩物。斯特拉塔技术(XT)正在提供AlbionProcess植物作为我的一个技术package.Run矿石将被研磨并进行浮选以每18%每年produceapproximately 100,000吨w / w的硫化物concentrateand每浮选尾矿的每年900,000吨。 Albion Prodallant将氧化硫化物浓缩物,释放金和银腐烂。氧化浓缩物和浮选尾矿将通过现有的CIL植物进行混合和加工,以回收超过90%的黄金和85%的银,因为从矿井矿石的牛群中腐烂。Albion过程工厂接近完成Antplant调试将开始3月/ 4月,2014年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号