RISK ALLOCATION MECHANISM FOR BUILDING PROJECTS BASED ON THE RIBA PLAN OF WORK

机译:基于RIBA工作计划建立项目的风险分配机制

获取原文

摘要

The Zambian construction industry, like many other construction industries in developing countries, is characterized with frequent project failure evidenced by quality shortfalls, cost overruns, time overruns and, on occasion, abandonment of projects. Various construction industries, particularly developed ones, have mechanisms in place to alleviate the aforementioned risks. Moreover, it has been reported that construction organizations in developing countries, approach risk management implied risk allocation in construction projects by using a set of practices that are normally insufficient, often produce poor results, and limit the success of project outcome. It is from this background that a risk allocation mechanism tailored to the Zambian building sector is proposed, based on the RIBA plan of work for new large to medium sized projects. Various mechanisms and processes are documented in the existing literature, all developed for particular jurisdictions, project types and modes of procurement. Though beneficial, the crafting of most of these mechanisms does not focus on curtailing sources of inappropriate risk allocation, but rather focuses on who, between the client and contractor, should be allocated a particular risk. This paper documents a mechanism for risk allocation after establishing the causes of risk misallocation through a questionnaire survey, interviews, and document analysis. The mechanism integrates contract practice and risk management to make it robust for alleviating both contractual and non-contractual risks. However, its utility, to an extent, is dependent on the risk perceptions of the user as it is driven by decisionmaking.
机译:赞比亚建筑业,像许多发展中国家的其他建筑等行业,特点是由质量不足,成本超支,超支时间证明频繁项目失败,偶尔,项目放弃。各种建筑等行业,特别是发达国家,有适当的机制来缓解上述风险。此外,有报道称施工单位在发展中国家,方法的风险管理,通过使用一组通常是不够的,往往会产生不好的结果,并限制项目成果的成功做法隐含的建设项目风险分配。正是从这一背景下,针对赞比亚建筑行业风险分配机制,提出了基于工作的新的大,中型项目的RIBA计划。各种机制和过程都记录在现有的文献,对于特定的司法管辖区,项目类型和采购方式的所有开发。虽然有益,大多数这些机制的各具特色不注重削减不适当的风险分配的来源,而是侧重于谁,业主和承包商之间的,应该被分配一个特定的风险。本文通过问卷调查,访谈和文献分析,建立风险配置不当的原因后,记录了风险分担的机制。该机制集成合同的做法和风险管理,使之强健缓解双方合同和非合同风险。然而,它的效用,在一定程度上,因为它是由决策驱动是依赖于用户的危险认识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号