首页> 美国政府科技报告 >PART I: Bioventing Pilot Test Work Plan for PS-2, PS-1A, PS-1B, Building 2034, Building 2035, Fairchild Air Force Base, Washington. PART II: Draft Bioventing Pilot Test Interim Results Report for PS-2, PS-1A, PS-1B, Building 2034, Building 2035, Fairchild Air Force Base, Washington. Volume 2
【24h】

PART I: Bioventing Pilot Test Work Plan for PS-2, PS-1A, PS-1B, Building 2034, Building 2035, Fairchild Air Force Base, Washington. PART II: Draft Bioventing Pilot Test Interim Results Report for PS-2, PS-1A, PS-1B, Building 2034, Building 2035, Fairchild Air Force Base, Washington. Volume 2

机译:第一部分:华盛顿费尔柴尔德空军基地ps-2,ps-1a,ps-1B,2034号楼,2035号楼的生物通风试验工作计划。第二部分:华盛顿费尔柴尔德空军基地ps-2,ps-1a,ps-1B,2034号楼,2035号建筑物的Bioventing试验中试结果报告草案。第2卷

获取原文

摘要

This document has been prepared by Engineering-Science, Inc. to support the bioventing initiative contract awarded by the Air Force Center for Environmental Excellence. The contract involves the conducting of bioventing pilot tests at 35 sites on 23 Air Force bases across the United States. At most sites, bioventing systems will be installed upon completion of the initial bioventing pilot tests for the purpose of extended pilot testing. These systems will operate for a 1-year period to provide further information as to the feasibility of the technology at each site, and to provide interim remedial action. This Operations and Maintenance Manual has been created for sites at which regenerative or rotary-vane blowers have been installed for extended pilot testing. Basic maintenance of these systems is the responsibility of the Air Force facility. This manual is to be used by facility personnel to guide and assist them in operating and maintaining the blower system. Section 2 provides a summary of the bioventing system components installed. Section 3 of this document describes the blower system. Section 4 details the maintenance requirements and provides maintenance schedules. Section 5 describes the system monitoring that is required to forecast system maintenance needs and to provide data for the extended pilot test. Blower performance curves and relevant service information for regenerative and rotary-vane blowers are provided in Appendices A and B, respectively, and data collection sheets are provided in Appendix C.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号