首页> 外文会议>International Conference on Applied Science and Technology >A study on the skill competency of contractor in overcoming construction project delay
【24h】

A study on the skill competency of contractor in overcoming construction project delay

机译:承包商克服建设项目延迟技能能力研究

获取原文

摘要

Contractors are responsible for the overall success of delivering the owner's physical development within the constraints of cost, time, quality and safety requirements. Contractors must increasingly improve themselves accountable for the construction environment since most contributing project delay factors were raised from the contractor. This research was carried out with the objectives to identify the contractor related factors contributing to the construction project delay, to identify the skill competencies for contractors to overcome construction project delay, and to study the relationship among the contractor's competencies as it relates to overcome construction project delay. This research study focused on the five competencies namely financing skill, managerial skill, communication skill, people management skill, technology management skill and followed by identification of the elements for each competency. The quantitative research approach was used with 51 G7 contractors participated in answering the questionnaires. Data were then analyzed using SPSS tool. Results showed that the top three project delay factors were conflicts between contractor and other parties rework due to errors during construction, ineffective planning and scheduling of project. Meanwhile, managerial skill, financing skill, and people management skill were identified as the key competencies for contractors. The key elements for each competency and their relative importance were also determined.
机译:承包商负责在成本,时间,质量和安全要求的限制内提供所有者的物理发展的整体成功。承包商必须越来越改善自己对建筑环境负责,因为大多数贡献项目延误因素从承包商提出。本研究是为了确定有助于建设项目延误的承包商相关因素,以确定承包商克服建设项目延误的技能能力,以及研究承包商能力的关系,因为它涉及克服建设项目延迟。本研究专注于五个能力即融资技能,管理技能,沟通技能,人物管理技能,技术管理技能,以及识别每个能力的元素。定量研究方法用于51个G7承包商参与回答问卷。然后使用SPSS工具分析数据。结果表明,由于建设中的错误,项目无效规划和调度,承包商和其他缔约方之间的冲突。同时,管理技能,融资技能和人民管理技能被确定为承包商的主要能力。还确定了每个能力的关键要素及其相对重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号