首页> 外文会议>International Workshop on Electric Drives >Crossrail — London's new underground railway
【24h】

Crossrail — London's new underground railway

机译:Crossrail - 伦敦的新地下铁路

获取原文

摘要

Crossrail is a new railway project in the South East of England passing from East to West underneath Central London and connecting to eight existing Underground and Mainline Stations. This involves the upgrade of over 200km of surface railway along with the replacement or upgrade of 30 existing surface stations and the construction of 42km of a new 7.2m diameter tunnel with two crossovers and two bifurcations, connecting eight new underground and one new surface station in Central London. As London is ever-expanding, with the World Financial and Service Centres at the heart of its commerce, Crossrail will increase the rail capacity into the Capital by 10%, bringing an extra 1.5 million people to within 45 minutes of its city centre. Work started in 2009 with the driving of the first pile into the dock at Canary Wharf (East London), but now we are coming to the latter stages of this £14.8bn project and we have just energised the 25kV overhead line system for early Dynamic Testing. With over 100 million man-hours having been spent on the project to date, we are now on target for completion and full passenger service in time for Christmas 2019. This paper intends to give a few highlights of significant issues identified on the project to date.
机译:横梁在英格兰东南部的东传到西方伦敦中部的下方,并连接到现有八个地铁站和主线站有新的铁路项目。这涉及表面铁路200公里的升级与替换或升级的现有30表面站和一个新7.2米直径隧道具有两个交叉和两个分岔42公里的构造一起连接八个新地下,并且在一个新的表面站伦敦市中心。由于伦敦是在其商业的心脏不断扩大,与世界金融和服务中心,横梁将10 %,增加铁路运力成资本,带来额外的150万人到45分钟的市中心内。工作于2009年开始与第一根桩到金丝雀码头(伦敦东区)码头的驱动,但现在我们来到这个148亿£项目的后期阶段,我们刚刚通电的25千伏架空线系统动态早测试。与已花在项目上迄今超过100万工时,我们现在对完成为目标,充满乘客服务的时间为2019年圣诞节本文拟给出确定该项目迄今显著问题的一些亮点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号