Crossrail is a new railway project in the South East of England passing from East to West underneath Central London and connecting to eight existing Underground and Mainline Stations. This involves the upgrade of over 200km of surface railway along with the replacement or upgrade of 30 existing surface stations and the construction of 42km of a new 7.2m diameter tunnel with two crossovers and two bifurcations, connecting eight new underground and one new surface station in Central London. As London is ever-expanding, with the World Financial and Service Centres at the heart of its commerce, Crossrail will increase the rail capacity into the Capital by 10%, bringing an extra 1.5 million people to within 45 minutes of its city centre. Work started in 2009 with the driving of the first pile into the dock at Canary Wharf (East London), but now we are coming to the latter stages of this £14.8bn project and we have just energised the 25kV overhead line system for early Dynamic Testing. With over 100 million man-hours having been spent on the project to date, we are now on target for completion and full passenger service in time for Christmas 2019. This paper intends to give a few highlights of significant issues identified on the project to date.
机译:Crossrail是英格兰东南部的一个新铁路项目,在伦敦市中心下方从东西向穿过,并连接到现有的八个地铁站和干线站。这涉及升级200多公里的地面铁路,替换或升级现有的30个地面站,以及建设42公里的新的7.2m直径的隧道,该隧道有两个交叉点和两个分叉点,连接了八个新的地下和一个新的地面站。伦敦市中心。随着伦敦的不断扩展,以世界金融和服务中心为中心的商业活动,Crossrail将使首都的铁路运力增加10%,从而在距市中心45分钟之内增加150万人。该工程始于2009年,当时是将第一批桩打入金丝雀码头(东伦敦)的码头,但现在,我们进入了这个耗资148亿英镑的项目的后期,我们刚刚为25 kV动态高架桥供电测试。迄今为止,该项目已花费了超过1亿工时,我们现在的目标是在2019年圣诞节之前完成并提供全面的客运服务。本文旨在重点介绍迄今为止在该项目上发现的重要问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号