INSTALLATION OF SECANT PILE WALL IN ROCK ADJACENT TO FRAGILE BUILDING

机译:在岩石旁边的岩石桩墙安装近距离建筑

获取原文

摘要

The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonry building. The maximum difference between the lowest and highest rock elevations was about 30 feet, which posed a problem for the installation of secant piles that formed the supporting retaining wall for the excavation. At certain areas, the rock levels were higher than the top of the invert slab of the ancillary structure. To avoid disturbance to the adjacent fragile building, the secant piles were fully cased for drilling through the overburden soils and the rock sockets were formed using non-vibratory technique. This paper discusses the design and installation details of the secant pile wall and the contingency measures that were considered to mitigate the highly variable rock conditions. Monitoring of the adjacent fragile building showed that impact of pile installation were controlled within tolerable limits and safety of the building was not compromised.
机译:纽约市曼哈顿新的第二大道地铁线建设辅助结构,涉及易变岩石条件的深度挖掘,毗邻脆弱的砌体建筑。最低和最高岩石高度之间的最大差异为约30英尺,这为安装支撑挡土墙的割割桩而构成了用于挖掘的问题。在某些区域,岩石水平高于辅助结构的倒置板的顶部。为避免对邻近易碎建筑的干扰,将割割桩完全甲壳用于钻孔,通过覆盖覆盖的土壤,使用非振动技术形成岩体。本文讨论了SECANT桩墙的设计和安装细节以及被认为减轻了高度可变岩石条件的应变措施。监测相邻的脆弱建筑,显示桩安装的影响被控制在容忍的限度内,并且建筑物的安全性并未受到损害。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号