首页> 外国专利> Building construction system on piles - places wall on pile heads before installation without using foundation beam

Building construction system on piles - places wall on pile heads before installation without using foundation beam

机译:桩上的建筑施工系统-安装前在不使用基础梁的情况下将墙放在桩头上

摘要

The system constructs buildings with side and end walls, intermediate walls and floors, founded on heated piles under the walls. Before installing one or more of the walls, this is placed directly on pile heads below without the use of a foundation beam, after which the floors are installed. Combined walls and foundation beams can be used, equipped with supports for floors, either prefabricated or cast in situ. The pile heads can each be formed by a prefabricated reinforced concrete ring, placed over the pipe top after the reinforcing components in the latter have been exposed. They are then secured together by pouring concrete.
机译:该系统构建的建筑物具有侧壁和端壁,中间墙和地板,并以墙下的加热桩为基础。在安装一堵或多堵墙之前,不使用基础梁将其直接放置在下面的桩头上,然后安装地板。可以使用组合的墙和基础梁,并配有预制的或现场浇铸的地板支撑。每个桩头都可以由预制的钢筋混凝土环形成,该环在管中的钢筋组件暴露后放置在管顶部上。然后通过浇筑混凝土将它们固定在一起。

著录项

  • 公开/公告号NL8204230A

    专利类型

  • 公开/公告日1984-06-01

    原文格式PDF

  • 申请/专利权人 SCHOKBETON B.V. TE KOUDEKERK AAN DEN RIJN.;

    申请/专利号NL19820004230

  • 发明设计人

    申请日1982-11-01

  • 分类号E04B1/04;

  • 国家 NL