首页> 外文会议>UK AES Conference on Audio Education >CASE STUDY: EXPANDING AUDIO PRODUCTION FACILITIES AT OHIO UNIVERSITY TO ACCOMMODATE STUDENT NEEDS
【24h】

CASE STUDY: EXPANDING AUDIO PRODUCTION FACILITIES AT OHIO UNIVERSITY TO ACCOMMODATE STUDENT NEEDS

机译:案例研究:扩展俄亥俄大学的音频生产设施,以满足学生需求

获取原文

摘要

Creating a recording facility is equal parts art and science. However, designing and adapting recording studios in higher education environments presents several challenges unseen within the commercial arena. In its third, major design iteration since the formation of the College of Communication in 1968, the School of Media Arts & Studies has expanded its facilities to include a new mixing and mastering suite, an expansive 5.1 post-production and critical listening facility, and numerous classrooms and additional lab spaces, more than tripling the space available to faculty, graduate and undergraduate students.
机译:创建录音设施是相同的零件艺术和科学。然而,在高等教育环境中设计和调整录音室的录音工作室呈现出在商业舞台内的几个挑战。在其第三次重大设计迭代以来,自1968年形成沟通学院以来,媒体艺术与研究学院已经扩大了其设施,包括新的混合和掌握套件,这是一个扩大的5.1后期生产和关键的听力设施,以及众多教室和额外的实验室空间,超过了教师,毕业生和本科生的空间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号