首页> 外文会议>International Congress on Advances in Nuclear Power Plants >Development and Verification of a Leningrad NPP Unit 1 Living PSA Model in the INL SAPHIRE Code Format for Prompt Operational Safety Level Monitoring
【24h】

Development and Verification of a Leningrad NPP Unit 1 Living PSA Model in the INL SAPHIRE Code Format for Prompt Operational Safety Level Monitoring

机译:Leningrad NPP单元1 Live PSA模型的开发与验证INL Saphire Code格式以提示运行安全水平监测

获取原文

摘要

The first part of the paper presents results of the work, that was carried out in complete conformity with the Technical Assignment, which was developed by Leningrad Nuclear Power Plant. The initial scientific and technical information, contained into the In-Depth Safety Assessment Reports, was given to the author of the work. This information was received within the framework of the cooperation between the USA Pacific North-West National Laboratory (PNNL), Leningrad NPP and RRC "Kurchatov Institute". This information included graphical Fault Trees of Safety Systems and Auxiliary Technical Systems, Event Trees for the necessary number of Initial Events, and also information about failure probabilities of basic components of the nuclear unit. On the basis of this "paper" information the author of the paper, using the USA Idaho National Laboratory (INL) SAPHIRE code: (1) firstly, have developed an electronic version of the Data Base for failure probabilities of the components of technical systems, (2) secondly, have developed an the electronic versions of the necessary Fault Trees, (3) thirdly, have developed an electronic versions of the necessary Event Trees and, (4) at last, have carried out the linkage of the Event Trees. In the result there was received an Living PSA(LPSA) Model of Leningrad NPP Unit 1. The LPSA-model is completely adapted to inclusion it into the USA INL SAPHIRE Risk Monitor. The second part of the paper results in analysis of fire consequences in various places of Leningrad NPP Unit 1. The computations were carried out with the help of the LPSA-model, developed in SAPHIRE code format. On the basis of the computations the order of priority of implementation of fire prevention measures was established. Besides it was shown, that this LPSA-model may be applied for prompt monitoring of operational safety level of Leningrad NPP Unit 1.
机译:论文的第一部分呈现了工作的结果,该工作的完全符合技术任务,由列宁格勒核电站开发。符合深入安全评估报告中的初始科学和技术信息,给了该工作的作者。该信息是在美国太平洋西北国家实验室(PNNL),列宁格勒NPP和RRC“Kurchatov Institute”的合作框架内。这些信息包括安全系统和辅助技术系统,事件树的图形故障树的初始事件,也对核电机组的基本组成部分的失效概率信息的必要数量。在此“纸”的信息的文件的作者,使用美国爱达荷国家实验室(INL)SAPHIRE代码的基础:(1)首先,开发了数据库的电子版技术系统的部件的失效概率(2)其次,已开发出一种必要的故障树的电子版本,(3)第三,已经开发了必要的事件树的电子版本,并,(4)最后,都进行了事件树的联动。在其结果存在被接收的生活PSA列宁格勒NPP单元1的LPSA模型的(LPSA)模型是完全适合于包含入美国INL SAPHIRE风险监视器。在列宁格勒核电站机组1的各处的计算用的LPSA模型的帮助下,在SAPHIRE代码格式开发进行了火灾后果分析论文结果的第二部分。在计算的基础上,建立了防火措施实施的优先顺序。除了已显示,这LPSA模型可以应用于提示监测列宁格勒NPP单元1的操作的安全性的水平。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号